FTE Central FL DMS
Project Description: Deploy Dynamic Message Signs (DMS) on FTE roadways in Central Florida.
Project Status: Planned
Project Stakeholders:
Interconnect and Flow
Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
FTE Data Dissemination Field Equipment - Roadway Traffic Information Dissemination
-
1: The field element shall include dynamic message signs for dissemination of traffic and other information to drivers, under center control; the DMS may be either those that display variable text messages, or those that have fixed format display(s) (e.g. vehicle restrictions, or lane open/close).
-
FTE Operations Center (Pompano) - TMC Traffic Information Dissemination
-
1: The center shall remotely control dynamic messages signs for dissemination of traffic and other information to drivers.
-
FTE Operations Center (Turkey Lake) - TMC Traffic Information Dissemination
-
1: The center shall remotely control dynamic messages signs for dissemination of traffic and other information to drivers.
Standards:
Project Operational Concepts:
Last Updated 4/16/2024