FTE Southern FL DMS
Project Description: Deploy Dynamic Message Signs (DMS) on FTE roadways in Southern Florida.
Project Status: Planned
Project Stakeholders:
Interconnect and Flow
Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
FTE Data Dissemination Field Equipment - Roadway Traffic Information Dissemination
-
01: The field element shall include dynamic message signs for dissemination of traffic and other information to drivers, under center control; the DMS may be either those that display variable text messages, or those that have fixed format display(s) (e.g. vehicle restrictions, or lane open/close).
-
03: The field element shall provide operational status for the driver information systems equipment (DMS, HAR, etc.) to the center.
-
04: The field element shall provide fault data for the driver information systems equipment (DMS, HAR, etc.) to the center for repair.
-
FTE Operations Center (Pompano) - TMC Traffic Information Dissemination
-
01: The center shall remotely control dynamic messages signs for dissemination of traffic and other information to drivers.
-
03: The center shall collect operational status for the driver information systems equipment (DMS, HAR, etc.).
-
04: The center shall collect fault data for the driver information systems equipment (DMS, HAR, etc.) for repair.
-
FTE Operations Center (Turkey Lake) - TMC Traffic Information Dissemination
-
01: The center shall remotely control dynamic messages signs for dissemination of traffic and other information to drivers.
-
03: The center shall collect operational status for the driver information systems equipment (DMS, HAR, etc.).
-
04: The center shall collect fault data for the driver information systems equipment (DMS, HAR, etc.) for repair.
Standards:
Project Operational Concepts:
Last Updated 5/25/2023