FDOT District 1 Regional ITS Architecture (Final)

Projects


(Printable Version)

The Regional ITS Architecture provides a starting point for project definition. It provides an overall framework that shows how anticipated projects will integrate with each other and with existing systems. This page lists all the ITS projects that have been mapped to the regional ITS architecture.

Short term projects are scheduled for the next 5 years. Medium term projects are scheduled for between 5 - 10 years. Long term projects are scheduled for more than 10 years.

Select a project from the box below to jump to that ITS project.

Project Name Project Status Timeframe Project Description
I-4 Low Visibility Detection and Warning System Planned The I-4 Low Visibility Detection and Warning System will warn travelers and FDOT staff about low visibility on I-4 due to fog. FDOT District 1 will pay for this system, but FDOT District 7 will operate and maintain the system
Charlotte County Emergency Signal Preemption Planned Long This project would deploy emergency signal preemption in Charlotte County
FDOT Connected Vehicles Planned Long This project would deploy V2I equipment in FDOT District 1. This is a generic long term project covering all V2I interfaces found in the regional ITS architecture.
I-75 Express Lanes Planned Long This project would install tolled express lanes on I-75
Charlotte County Center Coordination Planned Medium This project would connect the Charlotte County/Punta Gorda ATMS with the Charlotte County EOC. The EOC would like the ability to view ATMS cameras, but would not have the ability to control cameras.
Charlotte County Equipment Replacement Planned Medium This project would replace signals and cameras in Charlotte County over the next 5-10 years. This could also include an upgrade of Charlotte County ATMS video detection software. The current system operates on intersections that are mast armed. As span intersections are replaced with masts they are expecting to expand the use of video detection.
Charlotte County Traffic Signal Upgrades Planned Medium This project will upgrade traffic signals in Charlotte County.
City of Lakeland Traffic Control Equipment Upgrade Planned Medium This project would upgrade City of Lakeland traffic control equipment.
City/County Coordination Planned Medium This project would connect the FDOT District 1 SWIFT Center with city and county TMCs in the region, such as Collier, Lee, Charlotte, Sarasota, Manatee Counties, as well as the cities of Naples, Lakeland, Bradenton, Sarasota, Punta Gorda, Ft., Myers and Winter Haven
Collier County Roadside Lighting Wireless Mesh Network Planned Medium This project would utilize a wireless mesh network , provided by roadside LED lighting, to connect traffic count equipment and bluetooth travel time detectors. In places where roadside LED lights have been deployed, traffic count equipment, bluetooth travel time detectors, and other ITS equipment could be deployed without installing additional communications infrastructure, such as fiber or wireless/cell networks.
Expansion of I-4 Low Visibility Detection and Warning System Planned Medium This project would expand the low visibility detection and warning system on I-4.
FDOT D1 Highlands County ATMS Expansion Planned Medium This project would upgrade the existing Highlands County Closed Loop System to an ATMS including CCTV cameras, detection, communications upgrade and other ITS devices.
FDOT D1 Parking Availability System Planned Medium This project would create a parking availability system for truck drivers in along the I-75 corridor. This system will allow CV drivers to keep in compliance with federal hours-of-service regulations, combat driver fatigue, and increase safety. The system would utilize sensors to detect open truck parking spaces at rest areas and private facilities. This information would then be disseminated to truckers via DMS, and web sites/applications.
I-75 Detour Planned Medium This project would allow FDOT to post detour information on static or portable DMS to guide travelers in case of an I-75 detour.
I-75 Ramp Meters Planned Medium This project would install ramp meters on I-75
Manatee County SmartCard Pilot Project Planned Medium This project would create a common fare payment system with neighboring counties
Manatee County Transit Signal Priority Planned Medium This project will provide Transit Signal Priority for MCAT buses
Manatee County Transit Vehicle Signal Priority Planned Medium Install/Upgrade module for transit priority into the central software.
Manatee County Unmanned Aerial Vehicles (UAV) for Traffic Monitoring Planned Medium Monitor Traffic with the aid of Unmanned Aerial Vehicles (UAV)
Manatee County Vehicle-to-Infrastructure (V2I) Capability and Integration Planned Medium Provide a system capable of V2I integration and capable of deriving benefits from the vehicles equipped with connected technologies.
MCAT Paratransit IVR Planned Medium This project would create an Interactive Voice Response (IVR) system for MCAT paratransit
Polk County/City of Lakeland Coordination Planned Medium This project would connect the Polk County TMC to the City of Lakeland ATMS
RWIS Expansion Planned Medium This project would install additional RWIS devices in FDOT District 1
I-75 Additional ITS Devices Planned Medium. This project would install additional unspecified ITS devices on I-75
Airport Road Adaptive Traffic Signal System Project Planned Short This project will install an adaptive traffic signal system on Airport Road in Collier County on 10 signals.
Bartow Adaptive Signal System Planned Short This project would deploy an adaptive signal system on five intersections in Bartow. A Bluetooth detection system would be deployed as part of this project. The Bluetooth detection will be implemented to determine whether the adaptive signal system is performing as well as planned. This BlueToad/Bluetooth system will be implemented on the 5 intersections. Polk County will maintain the system. The plan is for this project to be a design/build/operate/ maintain contract. The contractor will operate and maintain the Bluetooth system, which will have a web based interface with the vendor. Polk County will eventually operate the adaptive signal system but the contract maintenance may possibly be extended.
Cape Coral Traffic Monitoring Center Planned Short This project would create a Cape Coral Traffic Monitoring Center. The center would have the ability to monitor traffic ,but control would remain with Lee County.
CCAT AVL Planned Short This project would install CAD/AVL on CCAT buses
CCAT Transit Signal Priority Planned Short This project would install Transit Signal Priority in Collier County.
Charlotte County/FDOT Coordination Planned Short This project would allow FDOT to view Charlotte County incident management CCTV through the Charlotte County ATMS.
City of Fort Myers DMS Planned Short In this project, the City of Fort Myers plans to use DMS to inform residents and the public about big events in downtown Fort Myers and direct the traveling public where to park. Last year Fort Myers had over 70,000 visitors at Art Fest.
City of Fort Myers Lightning Warnings Planned Short This project will connect the Weather-Bug service to the City of Fort Myers ATMS with the aim of warning people through DMS about incoming lightning in the Fort Myers area
City of Fort Myers Parking and ATMS Planned Short Under this project, the City of Fort Myers will connect public garages to the City of Fort Myers ATMS to inform people how many spaces are available
City of Lakeland Bus Rapid Transit Planned Short This project would deploy Bus Rapid Transit in the City of Lakeland, including TSP.
City of Lakeland Railroad Crossing Traffic Rerouting Planned Short This project would re-route traffic when trains come through the City of Lakeland. Traffic would be re-routed using DMS.
City of Lakeland Video Wall Upgrade Planned Short This project would upgrade the City of Lakeland ATMS video wall.
City of Naples Emergency Signal Preemption Planned Short This project would deploy emergency signal preemption for both police and fire in the City of Naples. This project covers the traffic signal portion of emergency signal preemption.
City of Naples Emergency Signal Preemption - Vehicles Planned Short This project would deploy emergency signal preemption for both police and fire in the City of Naples. This project covers the retrofitting emergency vehicles portion of emergency signal preemption.
City of Naples Equipment and Fiber Expansion Planned Short This project would expand ITS equipment, including 41 CCTV in downtown Naples, as well as extending fiber in the City of Naples
City of Naples Software Upgrade Planned Short This project would upgrade the City of Naples ATMS and integrate it with the Collier County ATMS. This would include video integration with FDOT - each agency would be able to share images, but not control of CCTV. Finally, this project would include traffic signal upgrades and traffic signal coordination.
Collier Area Paratransit Vehicles Upgrade Planned Short ITS equipment planned to be installed on the paratransit vehicles to possibly include passenger counting, fare management, real time bus information, closed mic radio system, closed circuit TV and transit signal priority.
Collier Area Transit Kiosks Planned Short Collier Area Transit plans to have kiosks to provide individuals with traveler information. Transit kiosks will provide information to transit customers, support electronic fare payment, enhance security at transit stops.
Collier Area Transit Stops/Stations Equipment Planned Short This element includes places where travelers catch the bus and need schedule, transit service, and real time arrival information to support their travel choices. Collier Area Transit intends to add more real time travel features to be acceptable via QR Code, text messaging, web based and touch tone phone.
Collier Area Transit Vehicles Upgrade Planned Short ITS equipment planned to be installed on the fixed route vehicles to possibly include closed mic radio system, closed circuit TV and transit signal priority.
Collier County Arterial Monitoring Cameras Planned Short This project will upgrade the Closed-Circuit Television (CCTV) cameras that support the MPEG-2 video format to H.264 video format and standardize the County's video format.
Collier County Emergency Signal Preemption Planned Short This project will install emergency signal preemption for the fire department in Collier County
Collier County ITS Integrate/Standardize Network Communication Planned Short This project will standardize the managed field ethernet switches across Collier County and the City of Naples. The fiber optic communication network will be reconfigured to increase the reliability of the ATMS by adding redundancy.
Collier County Remote LED Lighting Control Planned Short This project will extend the capabilities of Collier County's current roadway lighting control system. This system allows the Collier County ATMS to dim lights in non-critical locations between midnight and 4am
Collier County TMC Software Update Planned Short This project will update the ATMS software and the traffic controllers.
Collier County Traffic and Emergency Services Coordination Planned Short This project would create a connection between the Collier County ATMS and the Collier County Fire/EMS
Collier County Traffic Management Center (TMC) Video Wall Upgrade Planned Short This project will replace the hardware that is nearing end of service life at the Collier County TMC with a new video wall controller, displays, servers, switches and firewalls.
Collier County Travel Time Planned Short Under this project, a private third party provider will report travel times taken from Bluetooth readers in Collier County to the Collier County TMC
CR 31 (Airport Pulling Road) from Glades Boulevard to Longboat Drive (Adaptive Signal Control) Planned Short This project will implement adaptive signal control systems along the corridor and will adjust the timing of red, yellow and green signals to accommodate changing traffic patterns, ease traffic congestion, and maximize the capacity of existing conditions.
FDOT D1 ITS Device Deployment Planned Short This project would install additional unspecified ITS devices on local or arterial roadways in any of the District One Counties.
FDOT District 7 Coordination Planned Short This project would run fiber to connect FDOT District 1 SWIFT Center with FDOT District 7 to coordinate CCTV images
FDOT Lee County ATMS Expansion Planned Short This project will expand the existing ATMS to additional intersections.
I-75 Arterial DMS Planned Short This project will install DMS on arterials leading to I-75 in FDOT District 1
I-75 ITS Replacement Planned Short This project would replace and upgrade ITS devices on I-75, such as DMS
Lee County Adaptive Signal System Planned Short This project would install an adaptive traffic signal system in Lee County
Lee County Arterial Travel Time Monitoring Planned Short This project would monitor arterial travel times via Bluetooth devices on arterials in Lee County.
Lee County BIMS Coordination Planned Short This project would connect the FDOT SWIFT Center with the Lee County Bridge Incident Management System.
Lee County Bridge Incident Management System Planned Short This project would provide automatic re-routing in case of bridge closures. The re-routing would be accomplished via DMS
Lee County CCTV Deployment Planned Short This project would install additional CCTV in Lee County.
Lee County Microwave Sensor Deployment Planned Short This project would deploy microwave sensors to monitor traffic volume and collect real-time traffic speeds. This information would then be pushed out to the public via a website or DMS.
Lee County/FDOT Coordination Planned Short This project would coordinate CCTV images between Lee County and FDOT District 1
LeeTran Automated Stop Announcements Planned Short This project would provide automated stop announcements on LeeTran buses
LeeTran Fare Collection Upgrade Planned Short This project would upgrade fare collection systems for LeeTran
LeeTran IT Initiatives - AVL Planned Short This project would install AVL on LeeTran buses with the aim of eventually providing real-time information to travelers via interactive kiosks and dynamic signage.
LeeTran Transit Signal Priority Planned Short This project would create transit signal priority for LeeTran
Manatee County Adaptive Signal Control Technology (ASCT) Implementation Planned Short Implement ASCT on major corridors
Manatee County ATMS Website Planned Short Implement multi-purpose website for aggregation and dissemination of traveler information (travel time, congestion, traffic incidents, DMS Message). The website will also integrate social media tools for dissemination of information to the traveling public.
Manatee County Bluetooth and Wireless - Real-Time Traveler Information System Planned Short Implement a countywide system with bluetooth and wireless capable devices to collect and calculate real-time traveler information (travel time, speed) and integrate this data with the ADMSs and ATMS website.
Manatee County CCTV Camera Expansion Planned Short Expand CCTV camera network to cover all thoroughfares and at other key locations.
Manatee County Centralized Data Collection System Planned Short Data collection, archiving, and mining system.
Manatee County Dynamic Message Sign (DMS) Expansion Planned Short Install additional Arterial Dynamic Message Signs (ADMSs) at strategic locations to provide traffic and incident information to the travelingpublic.
Manatee County Emergency Preemption System Planned Short This project will extend emergency traffic signal preemption in Manatee County from 3 signals to 41 signals. EMS will definitely have the ability to preempt traffic signals, and this may be extended to fire as well.
Manatee County Emergency.now- Emergency Vehicle Signal Priority Planned Short Install Emergency.now module in the central software. In FDOT Work Program FY16/FY17
Manatee County Fiber Optic Network Expansion Planned Short Expand existing fiber optic network to provide connectivity to additional signalized intersections and other ITS devices.
Manatee County Microwave Vehicle Detection System (MVDS) Expansion Planned Short Expand MVDS devices network to cover all thoroughfares.
Manatee County TMC Phase 3 Planned Short This project would add devices to determine travel time in Manatee County and create a traveler information web site.
Manatee County Vehicle Detection System Expansion (Video, Thermal) Planned Short Expand the existing vehicle detection system by replacing traditional inductive loops with video or thermal detection equipment with the capability of connecting the devices to the RTMC.
Manatee Countywide Wireless Network Planned Short Project will plan and facilitate integration of a countywide wireless network for network redundancies, rapid deployment of future ITS devices and provide connectivity to remote locations.
Manatee River Bridge ATIS Planned Short This project will add dynamic message signs (DMS) on the Desoto Bridge and Green Bridge.
Manatee-Sarasota ATMS Central Software Upgrades Planned Short Upgrade the central software to aid in unifying control modules from a single program.
Manatee-Sarasota RTMC Control Room Expansion/Upgrade Planned Short Provide upgrades to the control room infrastructure including video wall upgrade and expansion, installation of new workstations, installation of an 80" touch-enabled monitor to aid in decision making during incidents.
Manatee-Sarasota RTMC Network Upgrade Planned Short Upgrade the core switches to support a 1 Gbps connection and upgrade all the field edge switches (at each signal and ITS device location) to support a 1 Gbps connection. The project will also provide for additional network redundancies and network security
Manatee-Sarasota RTMC Server Upgrades Planned Short Upgrade servers to better serve the growing needs of a regional system. The project will provide for new equipment capable of handling CCTV camera feeds on individual workstations as well as video wall and upgrade other servers. The project will also consider virtualizing the servers.
MCAT ITS Project Phase 1 Planned Short ITS Project Phase 1 - The first phase of this multi-phase project would install Automated Passenger Counters on MCAT fixed-route buses
MCAT ITS Project Phase 2 Planned Short ITS Project Phase 2 - The second phase of this multi-phase project would install CAD, AVL, and Automatic Voice Announcements on MCAT fixed-route buses
MCAT ITS Project Phase 3 Planned Short ITS Project Phase 3 - The third phase of this multi-phase project would update the CAD/AVL system on MCAT paratransit. This would be a technology refresh for the paratransit system
MCAT ITS Project Phase 4 Planned Short ITS Project Phase 4 - The fourth and final phase of this multi-phase project will provide real-time information for MCAT fixed-route bus customers. This real-time information would initially be provided through a smartphone application. In addition, this project would provide yard management for the fixed route service.
Polk County Traffic Signal Upgrades Planned Short This project would upgrade traffic signals in Polk County and connect them to the Polk County TMC
Sarasota County BRT Planned Short This project would create a dedicated lane for buses on the Ringling Causeway. Currently, there is a breakdown lane on the causeway, which would be converted to a bus-only lane. In addition, this project may include transit signal priority for buses.
SCAT Farebox Upgrade Planned Short This project would create a common fare payment system with neighboring counties
University Parkway Adaptive Signal System Planned Short This project would deploy an adaptive signal system along University Parkway.
US-41 Widening Planned Short This project will widen US-41 and upgrade traffic cameras and traffic detectors along the roadway.