FDOT District 5 Regional ITS Architecture (Final)

Interconnect: Orange County Field Equipment - Orange County Traffic Management Center


(Click on image to view full-size)
Orange County Field Equipment - Orange County Traffic Management Center

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
Orange County Field Equipment environmental sensor data (P)
hri status (P)
roadway information system status (E)
signal fault data (E)
signal control status (E)
right-of-way request notification (P)
traffic probe data (E)
traffic images (E)
traffic flow (E)
Orange County Traffic Management Center
Orange County Traffic Management Center environmental sensors control (P)
hri request (P)
hri control data (P)
roadway information system data (E)
signal system configuration (E)
signal control plans (E)
signal control device configuration (E)
signal control commands (E)
video surveillance control (E)
traffic sensor control (E)
Orange County Field Equipment