FDOT District 5 Regional ITS Architecture (Final)

Interconnect: Orange County Field Equipment - Railroad Operators Wayside Equipment


(Click on image to view full-size)
Orange County Field Equipment - Railroad Operators Wayside Equipment

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
Orange County Field Equipment hri operational status (P)
Railroad Operators Wayside Equipment
Railroad Operators Wayside Equipment track status (E)
Orange County Field Equipment