FDOT District 5 Regional ITS Architecture (Final)

Interconnect: City of Daytona Beach Field Equipment - Railroad Operators Wayside Equipment


(Click on image to view full-size)
City of Daytona Beach Field Equipment - Railroad Operators Wayside Equipment

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
City of Daytona Beach Field Equipment hri operational status (P)
Railroad Operators Wayside Equipment
Railroad Operators Wayside Equipment track status (E)
City of Daytona Beach Field Equipment