FDOT District 5 Regional ITS Architecture (Final)

Interconnect: City of Winter Park Field Equipment - City of Winter Park Traffic Operations Center


(Click on image to view full-size)
City of Winter Park Field Equipment - City of Winter Park Traffic Operations Center

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
City of Winter Park Field Equipment environmental sensor data (P)
hri status (P)
roadway information system status (P)
right-of-way request notification (P)
signal fault data (E)
signal control status (E)
traffic images (P)
traffic flow (P)
City of Winter Park Traffic Operations Center
City of Winter Park Traffic Operations Center environmental sensors control (P)
hri request (P)
hri control data (P)
roadway information system data (P)
signal system configuration (E)
signal control plans (E)
signal control device configuration (E)
signal control commands (E)
video surveillance control (P)
traffic sensor control (P)
City of Winter Park Field Equipment