FDOT District 5 Regional ITS Architecture (Final)

Interconnect: Florida 511 - FHP Troop D Dispatch


(Click on image to view full-size)
Florida 511 - FHP Troop D Dispatch

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
Florida 511   FHP Troop D Dispatch
FHP Troop D Dispatch incident information (P)
Florida 511