FDOT District 5 Regional ITS Architecture (Final)

Interconnect: FTE Operations Center (Turkey Lake) - Local Venue Event Scheduling System


(Click on image to view full-size)
FTE Operations Center (Turkey Lake) - Local Venue Event Scheduling System

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
FTE Operations Center (Turkey Lake)   Local Venue Event Scheduling System
Local Venue Event Scheduling System event plans (P)
FTE Operations Center (Turkey Lake)