FDOT District 5 Regional ITS Architecture (Final)

Interconnect: Local Agency Traveler Information System - Local Transit Operator Systems


(Click on image to view full-size)
Local Agency Traveler Information System - Local Transit Operator Systems

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
Local Agency Traveler Information System transit information request (P)
selected routes (P)
demand responsive transit request (P)
Local Transit Operator Systems
Local Transit Operator Systems demand responsive transit plan (P)
transit and fare schedules (P)
transit schedule adherence information (P)
Local Agency Traveler Information System