FDOT District 5 Regional ITS Architecture (Final)

Interconnect: Local Transportation Data Collection Systems - SunRail Operations Control Center


(Click on image to view full-size)
Local Transportation Data Collection Systems - SunRail Operations Control Center

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
Local Transportation Data Collection Systems archive status (P)
archive requests (P)
SunRail Operations Control Center
SunRail Operations Control Center multimodal archive data (P)
Local Transportation Data Collection Systems