FTE Regional ITS Architecture (Final)

Service Packages For: ATMS - ATMS23-1_D8


  ATMS23-1_D8  
Scroll down to view list of elements, responsible agencies (stakeholders), candidate functional areas and requirements, and flows on this diagram.

List of Elements on this Diagram
Click on Element Name to go to Element Detail Page.
Element Name Stakeholder
FTE Traffic Control Field Equipment Floridas Turnpike Enterprise
FTE Operations Center (Pompano) Floridas Turnpike Enterprise
FTE Operations Center (Turkey Lake) Floridas Turnpike Enterprise

List of Stakeholder Elements and Roles on this Diagram
Click on Element Name to go to Page with Element Details.
Click on Functional Area/Role to go to Page with Candidate Functional Requirements.
Stakeholder Element Name Functional Area/Role Functional Area Description
Floridas Turnpike Enterprise FTE Operations Center (Pompano) Traffic Equipment Maintenance This equipment package monitors the operational status of field equipment and detects failures. It presents field equipment status to Traffic Operations Personnel and reports failures to the Maintenance and Construction Management Subsystem. The equipment package tracks the repair or replacement of the failed equipment. The entire range of ITS field equipment may be monitored by this equipment package including sensors (traffic, infrastructure, environmental, security, speed, etc.) and devices (highway advisory radio, dynamic message signs, automated roadway treatment systems, barrier and safeguard systems, cameras, traffic signals and override equipment, ramp meters, beacons, security surveillance equipment, etc.).
Floridas Turnpike Enterprise FTE Operations Center (Pompano) Collect Traffic Surveillance This equipment package remotely monitors and controls traffic sensors and surveillance (e.g., CCTV) equipment, and collects, processes and stores the collected traffic data. Current traffic information and other real-time transportation information is also collected from other centers. The collected information is provided to traffic operations personnel and made available to other centers.
Floridas Turnpike Enterprise FTE Operations Center (Turkey Lake) Collect Traffic Surveillance This equipment package remotely monitors and controls traffic sensors and surveillance (e.g., CCTV) equipment, and collects, processes and stores the collected traffic data. Current traffic information and other real-time transportation information is also collected from other centers. The collected information is provided to traffic operations personnel and made available to other centers.
Floridas Turnpike Enterprise FTE Operations Center (Turkey Lake) Traffic Equipment Maintenance This equipment package monitors the operational status of field equipment and detects failures. It presents field equipment status to Traffic Operations Personnel and reports failures to the Maintenance and Construction Management Subsystem. The equipment package tracks the repair or replacement of the failed equipment. The entire range of ITS field equipment may be monitored by this equipment package including sensors (traffic, infrastructure, environmental, security, speed, etc.) and devices (highway advisory radio, dynamic message signs, automated roadway treatment systems, barrier and safeguard systems, cameras, traffic signals and override equipment, ramp meters, beacons, security surveillance equipment, etc.).

List of Flows on this Diagram
Click on Architecture Flow to go to Page with Applicable ITS Standards.
Source Element Architecture Flow Destination Element
FTE Traffic Control Field Equipment lane management information FTE Operations Center (Pompano)
FTE Traffic Control Field Equipment lane management information FTE Operations Center (Turkey Lake)
FTE Operations Center (Turkey Lake) lane management control FTE Traffic Control Field Equipment
FTE Operations Center (Pompano) lane management control FTE Traffic Control Field Equipment