FDOT District 3 Rural Signal Upgrades
Project Description: Signal controllers will be upgraded and cellular communications from the Chipley RTMC will be installed to all signals in the following counties.
– Calhoun County
– Franklin County
– Gadsden County
– Gulf County
– Holmes County
– Jackson County
– Liberty County
– Wakulla County
– Washington County
Project Status: On-going
Project Stakeholders:
Interconnect and Flow
Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
County and Local Field Equipment - Roadway Signal Control
-
5: The field element shall report current preemption status to the center.
-
6: The field element shall return traffic signal controller operational status to the center.
-
7: The field element shall return traffic signal controller fault data to the center.
-
FDOT District 3 Chipley RTMC - TMC Basic Surveillance
-
1: The center shall monitor, analyze, and store traffic sensor data (speed, volume, occupancy) collected from field elements under remote control of the center.
-
2: The center shall monitor, analyze, and distribute traffic images from CCTV systems under remote control of the center.
-
FDOT District 3 Chipley RTMC - TMC Signal Control
-
1: The center shall remotely control traffic signal controllers.
-
10: The center shall adjust signal timing in respond to a signal prioritization, signal preemption, pedestrian call, multi-modal crossing activation, or other requests for right-of-way.
-
15: The center shall monitor, analyze, and store traffic sensor data (speed, volume, occupancy) collected from field elements at or near signalized intersections.
-
2: The center shall accept notifications of pedestrian calls.
-
3: The center shall collect traffic signal controller operational status and compare against the control information sent by the center.
-
4: The center shall collect traffic signal controller fault data from the field.
-
5: The center shall manage (define, store and modify) control plans to coordinate signalized intersections, to be engaged at the direction of center personnel or according to a daily schedule.
-
6: The center shall implement control plans to coordinate signalized intersections based on data from sensors.
-
7: The center shall manage boundaries of the control sections used within the signal system.
-
8: The center shall maintain traffic signal coordination including synchronizing clocks throughout the system.
-
9: The center shall implement control plans to coordinate signalized intersections based on data from sensors and connected vehicles.
Standards:
Project Operational Concepts:
Last Updated 4/29/2024