Mid Bay Bridge Fiber Communication Project
Project Description: This is a fiber project for a redundant loop that includes the DMS on the Mid Bay Bridge.
Project Status: Planned
Project Stakeholders:
Interconnect and Flow
Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
FDOT District 3 Chipley RTMC - TMC Traffic Information Dissemination
-
1: The center shall remotely control dynamic messages signs for dissemination of traffic and other information to drivers.
-
3: The center shall collect operational status for the driver information systems equipment (DMS, HAR, etc.).
-
4: The center shall collect fault data for the driver information systems equipment (DMS, HAR, etc.) for repair.
-
Mid Bay Bridge Field Equipment - Roadway Traffic Information Dissemination
-
1: The field element shall include dynamic message signs for dissemination of traffic and other information to drivers, under center control; the DMS may be either those that display variable text messages, or those that have fixed format display(s) (e.g. vehicle restrictions, or lane open/close).
-
3: The field element shall provide operational status for the driver information systems equipment (DMS, HAR, etc.) to the center.
-
4: The field element shall provide fault data for the driver information systems equipment (DMS, HAR, etc.) to the center for repair.
Standards:
Project Operational Concepts:
Last Updated 4/29/2024