Florida Department of Transportation
Florida Statewide and Regional ITS Architectures

Florida ITS Architecture Banner
 

FDOT Drawbridge Systems

Status: Existing

Description: Miami–based US Coast Guard determines schedule for bridge openings and closings based on marine traffic and weather conditions. Marine traffic receives information from the Coast Guard on bridge schedules. Bridge tenders working for FDOT Districts and Counties actually control the raising and lowering of the bridges. Transponders that provide bridge status information (none currently implemented) would provide this information directly to the FDOT District Office and other operating agencies.

Stakeholder: FDOT CO

Systems Interconnected
with the FDOT Drawbridge Systems


Architecture Flow Diagrams
which include FDOT Drawbridge Systems:

Architecture Flows
to/from the FDOT Drawbridge Systems:

FDOT Drawbridge Systems flows into icon FDOT District 4 Arterial Management System FDOT Drawbridge Systems flows into icon FDOT District 4 Field Equipment FDOT Drawbridge Systems flows into icon FDOT District 6 SunGuide Field Equipment FDOT Drawbridge Systems flows into icon FDOT District 6 SunGuide Transportation Management Center FDOT District 4 Field Equipmentflows into iconFDOT Drawbridge Systems FDOT District 6 SunGuide Field Equipmentflows into iconFDOT Drawbridge Systems

National ITS Architecture Subsystems
mapped to the FDOT Drawbridge Systems:

National ITS Architecture Services
associated with FDOT Drawbridge Systems:


Last Updated 4/16/2024