City of Fort Pierce Fiber Expansion
Project Description: This project will lay fiber along the Orange Corridor in Fort Pierce and connect traffic signals to the City of Fort Pierce Engineering Department Traffic Control
Project Status: On-going
Project Stakeholders:
Interconnect and Flow
Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
City of Fort Pierce Engineering Department Traffic Control - TMC Basic Surveillance
-
1: The center shall monitor, analyze, and store traffic sensor data (speed, volume, occupancy) collected from field elements under remote control of the center.
-
2: The center shall monitor, analyze, and distribute traffic images from CCTV systems under remote control of the center.
-
4: The center shall distribute road network conditions data (raw or processed) based on collected and analyzed traffic sensor and surveillance data to other centers.
-
6: The center shall maintain a database of surveillance equipment and sensors and associated data (including the roadway on which they are located, the type of data collected, and the ownership of each).
-
City of Fort Pierce Engineering Department Traffic Control - TMC Roadway Equipment Monitoring
-
2: The center shall collect and store CCTV surveillance system (traffic, pedestrian) operational status.
-
4: The center shall collect and store CCTV surveillance system (traffic, pedestrian) fault data send to the maintenance center for repair.
-
City of Fort Pierce Engineering Department Traffic Control - TMC Signal Control
-
1: The center shall remotely control traffic signal controllers.
-
4: The center shall collect traffic signal controller fault data from the field.
-
City of Fort Pierce Field Equipment - Roadway Basic Surveillance
-
1: The field element shall collect, process, digitize, and send traffic sensor data (speed, volume, and occupancy) to the center for further analysis and storage, under center control.
-
2: The field element shall collect, process, and send traffic images to the center for further analysis and distribution.
-
4: The field element shall return sensor and CCTV system operational status to the controlling center.
-
5: The field element shall return sensor and CCTV system fault data to the controlling center for repair.
-
City of Fort Pierce Field Equipment - Roadway Field Management Station Operation
-
1: The field element shall accept configuration information from the center.
-
2: The field element shall pass data provided by the center to local field devices and report data from the field devices back to the center.
-
City of Fort Pierce Field Equipment - Roadway Signal Control
-
1: The field element shall control traffic signals under center control.
-
3: The field element shall provide the capability to notify the traffic management center of pedestrian calls and pedestrian accommodations.
-
5: The field element shall report current preemption status to the center.
-
6: The field element shall return traffic signal controller operational status to the center.
-
7: The field element shall return traffic signal controller fault data to the center.
-
8: The field element shall report current transit priority status to the center.
Standards:
Project Operational Concepts: