FDOT District 7 Gandy Boulevard (Hillsborough Segment) CCTV/MVDS Deployment
Project Description: This project would deploy ITS along the Gandy Boulevard from west end of the Gandy Bridge to Dale Mabry Highway. The ITS deployment includes installing CCTV, Microwave Vehicle Detection System (MVDS), Communication Hub shelter, 144 strand trunk fiber optic communication and multiduct conduit system.
Project Status: Planned
Project Stakeholders:
Interconnect and Flow
Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
FDOT District 7 Field Equipment - Roadway Basic Surveillance
-
1: The field element shall collect, process, digitize, and send traffic sensor data (speed, volume, and occupancy) to the center for further analysis and storage, under center control.
-
2: The field element shall collect, process, and send traffic images to the center for further analysis and distribution.
-
4: The field element shall return sensor and CCTV system operational status to the controlling center.
-
FDOT District 7 Tampa Bay SunGuide Center - TMC Basic Surveillance
-
1: The center shall monitor, analyze, and store traffic sensor data (speed, volume, occupancy) collected from field elements under remote control of the center.
-
2: The center shall monitor, analyze, and distribute traffic images from CCTV systems under remote control of the center.
Standards:
Project Operational Concepts:
Last Updated 5/24/2024