Florida Department of Transportation
Florida Statewide and Regional ITS Architectures

Florida ITS Architecture Banner
 

FDOT Wrong Way Driving Project

Project Description: Part of FDOT's Wrong–Way Driving (WWD) Initiative, FDOT evaluated several countermeasures and found LED highlighted WRONG WAY signs to be one of the most effective countermeasures to warn a wrong–way entering motorist, notify other motorists and send alerts to RTMC/TMC. FDOT intends to expedite the deployment of this advanced WWD countermeasure at the 520 off–ramps in the identified WWD hot spots. Initially in District 3, there will be nine installations in Pensacola with every interchange in the District to follow.

Project Status: Planned

Project Stakeholders:
Project Inventory:

Project Service Packages: Project Information Flows:

Information Flow Source Element Destination Element Status
intersection geometry FDOT District 3 Field Equipment FDOT District 3 Road Ranger Service Patrol Vehicles Planned
roadway dynamic signage data City of Tallahassee STMC FDOT District 3 Field Equipment Existing
roadway dynamic signage data Escambia-Santa Rosa Regional ATMS FDOT District 3 Field Equipment Planned
roadway dynamic signage data FDOT District 3 Chipley RTMC FDOT District 3 Field Equipment Existing
roadway dynamic signage data Joint Crestview TMC FDOT District 3 Field Equipment Planned
roadway dynamic signage status FDOT District 3 Field Equipment City of Tallahassee STMC Existing
roadway dynamic signage status FDOT District 3 Field Equipment Escambia-Santa Rosa Regional ATMS Planned
roadway dynamic signage status FDOT District 3 Field Equipment FDOT District 3 Chipley RTMC Existing
roadway dynamic signage status FDOT District 3 Field Equipment Joint Crestview TMC Planned
wrong way vehicle detected FDOT District 3 Field Equipment City of Tallahassee STMC Planned
wrong way vehicle detected FDOT District 3 Field Equipment Escambia-Santa Rosa Regional ATMS Planned
wrong way vehicle detected FDOT District 3 Field Equipment FDOT District 3 Chipley RTMC Planned
wrong way vehicle detected FDOT District 3 Field Equipment Joint Crestview TMC Planned


Project Functional Requirements (Element - Functional Object):

Standards:

Project Operational Concepts:

Last Updated 4/29/2024