FDOT SR 520 Traffic Signal Upgrades
Project Description: Traffic signal upgrades at SR520 from Dellanoy Ave to S Banana Dr.
Project Status: Planned
Project Stakeholders:
Interconnect and Flow
Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
FDOT District 5 Field Equipment - Roadway Signal Control
-
4: The field element shall report the current signal control information to the center.
-
6: The field element shall return traffic signal controller operational status to the center.
-
FDOT District 5 RTMC - TMC Signal Control
-
1: The center shall remotely control traffic signal controllers.
-
3: The center shall collect traffic signal controller operational status and compare against the control information sent by the center.
-
4: The center shall collect traffic signal controller fault data from the field.
-
5: The center shall manage (define, store and modify) control plans to coordinate signalized intersections, to be engaged at the direction of center personnel or according to a daily schedule.
-
6: The center shall implement control plans to coordinate signalized intersections based on data from sensors.
-
7: The center shall manage boundaries of the control sections used within the signal system.
Standards:
Project Operational Concepts: