Brevard County Transit Upgrade
Project Description: Install AVL and APC systems to improve transit system.
Project Status: Planned
Project Stakeholders:
Interconnect and Flow
Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
SCAT Dispatch Center - Transit Center Passenger Counting
-
1: The center shall collect passenger count information from each transit vehicle.
-
SCAT Dispatch Center - Transit Center Vehicle Tracking
-
1: The center shall monitor the locations of all transit vehicles within its network.
-
2: The center shall determine adherence of transit vehicles to their assigned schedule.
-
SCAT Transit Vehicles - Transit Vehicle Schedule Management
-
2: The transit vehicle shall use the route information and its current location to determine the deviation from the predetermined schedule.
-
3: The transit vehicle shall calculate the estimated times of arrival (ETA) at transit stops.
Standards:
Project Operational Concepts:
Last Updated 4/19/2024