Votran Transit Priority
Project Description: Installation of transit priority systems in Volusia County.
– FDOT US 17/92 SunRail (DeBary to DeLand)
– SR 40/Granada Corridor
– US 92 Corridor
– SR 421/Dunlawton corridor
Project Status: Planned
Project Stakeholders:
Interconnect and Flow
Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
Volusia County Field Equipment - Roadway Signal Control
-
1: The field element shall control traffic signals under center control.
-
10: The field element shall receive request for transit vehicle signal priority.
-
4: The field element shall report the current signal control information to the center.
-
5: The field element shall report current preemption status to the center.
-
6: The field element shall return traffic signal controller operational status to the center.
-
7: The field element shall return traffic signal controller fault data to the center.
-
8: The field element shall report current transit priority status to the center.
-
Votran Transit Vehicles - Transit Vehicle Signal Priority
-
2: The transit vehicle shall send priority requests to traffic signal controllers at intersections, pedestrian crossings, and multimodal crossings on the roads (surface streets) and freeway (ramp controls) network that enable a transit vehicle schedule deviation to be corrected.
Standards:
Project Operational Concepts:
Last Updated 4/19/2024