TM19: Roadway Closure Management (FDOT District 5 Bridge Condition Sensor System) Diagrams
There are two diagrams below that represent this service package. The first is an interconnect diagram that just shows what elements are connected to each other.
The second is an information flow diagram that shows the information flowing between the connected elements.
TM19: Roadway Closure Management (FDOT District 5 Bridge Condition Sensor System) Interconnect Diagram
TM19: Roadway Closure Management (FDOT District 5 Bridge Condition Sensor System) Information Flow Diagram
Last Updated 4/19/2024