City of Clearwater Transit Signal Priority
Project Description: Implement transit signal priority on city streets to support PSTA operations in the city.
Project Status: Planned
Project Stakeholders:
Interconnect and Flow
Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
City of Clearwater Field Equipment - Roadway Signal Control
-
1: The field element shall control traffic signals under center control.
-
10: The field element shall receive request for transit vehicle signal priority.
-
City of Clearwater Traffic Control Center - TMC Signal Control
-
1: The center shall remotely control traffic signal controllers.
-
PSTA Transit Vehicles - Transit Vehicle Signal Priority
-
1: The transit vehicle shall determine the schedule deviation and estimated times of arrival (ETA) at transit stops.
-
2: The transit vehicle shall send priority requests to traffic signal controllers at intersections, pedestrian crossings, and multimodal crossings on the roads (surface streets) and freeway (ramp controls) network that enable a transit vehicle schedule deviation to be corrected.
Standards:
Project Operational Concepts:
Last Updated 5/24/2024