PSTA CAD/AVL Upgrade
Project Description: This project will update to Intelligent Vehicle Network(IVN5)for BRT buses.
Project Status: Planned
Project Stakeholders:
Interconnect and Flow
Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
PSTA Transit Management Center - Transit Center Fixed-Route Operations
-
4: The center shall dispatch fixed route or flexible route transit vehicles.
-
PSTA Transit Management Center - Transit Center Vehicle Tracking
-
1: The center shall monitor the locations of all transit vehicles within its network.
-
2: The center shall determine adherence of transit vehicles to their assigned schedule.
-
PSTA Transit Vehicles - Transit Vehicle On-Board Trip Monitoring
-
1: The transit vehicle shall track the current location of the transit vehicle.
-
PSTA Transit Vehicles - Transit Vehicle Schedule Management
-
1: The transit vehicle shall receive a vehicle assignment including transit route information, transit service instructions, traffic information, road conditions, and other information for the operator.
-
2: The transit vehicle shall use the route information and its current location to determine the deviation from the predetermined schedule.
-
3: The transit vehicle shall calculate the estimated times of arrival (ETA) at transit stops.
Standards:
Project Operational Concepts:
Last Updated 5/24/2024