: In this project, FDOT District 7 will study an Integrated Corridor Management (ICM) strategy for I–275 from South of I–4 to North of Bearss Ave. The parallel arterial corridors included in the study are USB 41 / SR 685 / Florida Ave / Tampa St from Kennedy Blvd to Bearss Ave. and US 41 / SR 45 / Nebraska Ave from Kennedy Blvd to Bearss Ave. The I–275 section will be studied for ramp metering, dynamic speed limits, hard shoulder running, and similar other TSM&O improvements. On the arterials, Connected Vehicle capabilities at the intersections and Dynamic Message Sign (DMS) will be deployed.