City of Winter Park Fiber Optic Extension (Fairbanks Avenue)
Project Description: This project would deploy fiber optic communication system in the City of Winter Park on Fairbanks Avenue from Clay Street to I–4.
Project Status: Planned
Project Stakeholders:
Interconnect and Flow
Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
City of Winter Park Field Equipment - Roadway Basic Surveillance
-
1: The field element shall collect, process, digitize, and send traffic sensor data (speed, volume, and occupancy) to the center for further analysis and storage, under center control.
-
2: The field element shall collect, process, and send traffic images to the center for further analysis and distribution.
-
4: The field element shall return sensor and CCTV system operational status to the controlling center.
-
City of Winter Park Field Equipment - Roadway Signal Control
-
1: The field element shall control traffic signals under center control.
-
4: The field element shall report the current signal control information to the center.
-
5: The field element shall report current preemption status to the center.
-
6: The field element shall return traffic signal controller operational status to the center.
-
7: The field element shall return traffic signal controller fault data to the center.
-
8: The field element shall report current transit priority status to the center.
-
City of Winter Park Traffic Operations Center - TMC Basic Surveillance
-
1: The center shall monitor, analyze, and store traffic sensor data (speed, volume, occupancy) collected from field elements under remote control of the center.
-
2: The center shall monitor, analyze, and distribute traffic images from CCTV systems under remote control of the center.
-
City of Winter Park Traffic Operations Center - TMC Signal Control
-
1: The center shall remotely control traffic signal controllers.
-
4: The center shall collect traffic signal controller fault data from the field.
-
6: The center shall implement control plans to coordinate signalized intersections based on data from sensors.
Standards:
Project Operational Concepts:
Last Updated 4/19/2024