FDOT SR 429 CCTV/DMS/VDS/Tolling
Project Description: Design and Installation of new ITS to include CCTV, DMS, VDS, Toll Gantries and Tolling VMS.
Project Status: Planned
Project Stakeholders:
Interconnect and Flow
Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
FDOT District 5 Field Equipment - Roadway Basic Surveillance
-
1: The field element shall collect, process, digitize, and send traffic sensor data (speed, volume, and occupancy) to the center for further analysis and storage, under center control.
-
2: The field element shall collect, process, and send traffic images to the center for further analysis and distribution.
-
4: The field element shall return sensor and CCTV system operational status to the controlling center.
-
FDOT District 5 Field Equipment - Roadway Traffic Information Dissemination
-
1: The field element shall include dynamic message signs for dissemination of traffic and other information to drivers, under center control; the DMS may be either those that display variable text messages, or those that have fixed format display(s) (e.g. vehicle restrictions, or lane open/close).
-
FDOT District 5 RTMC - TMC Basic Surveillance
-
1: The center shall monitor, analyze, and store traffic sensor data (speed, volume, occupancy) collected from field elements under remote control of the center.
-
2: The center shall monitor, analyze, and distribute traffic images from CCTV systems under remote control of the center.
-
FDOT District 5 RTMC - TMC Traffic Information Dissemination
-
1: The center shall remotely control dynamic messages signs for dissemination of traffic and other information to drivers.
-
3: The center shall collect operational status for the driver information systems equipment (DMS, HAR, etc.).
-
FTE Sunpass Toll Collection System - Roadway Toll Collection Support
-
1: The field element shall read data from passing vehicles to support toll payment transactions.
-
SunPass Tag - Light Vehicle Basic Toll/Parking Payment
-
1: The vehicle shall respond to requests from toll collection equipment for credit identity, stored value card cash, etc.
Standards:
Project Operational Concepts:
Last Updated 4/19/2024