Lake County Adaptive Phases
Project Description: ITS Device Deployment, including adaptive signal system and fiber.
Project Status: Planned
Project Stakeholders: 
             
             
                  Interconnect and Flow
                  
Diagrams
             
: 
Project Information Flows: 
Project Functional Requirements (Element - Functional Object): 
  - 
Lake County Field Equipment - Roadway Signal Control
  
    - 
4: The field element shall report the current signal control information to the center.
    
- 
6: The field element shall return traffic signal controller operational status to the center.
    
- 
7: The field element shall return traffic signal controller fault data to the center.
    
  - 
Lake County TMC - TMC Signal Control
  
    - 
1: The center shall remotely control traffic signal controllers.
    
- 
3: The center shall collect traffic signal controller operational status and compare against the control information sent by the center.
    
- 
4: The center shall collect traffic signal controller fault data from the field.
    
- 
5: The center shall manage (define, store and modify) control plans to coordinate signalized intersections, to be engaged at the direction of center personnel or according to a daily schedule.
    
- 
6: The center shall implement control plans to coordinate signalized intersections based on data from sensors.
    
- 
7: The center shall manage boundaries of the control sections used within the signal system.
    
Standards: 
Project Operational Concepts: 
Last Updated 8/27/2025