R2CTPO TSMO Phase 1 - East Volusia
Project Description: Phase 1 of the upgrade of the R2CTPO Advanced Traffic Management System (ATMS), or Deployment 1, is located in the Daytona Beach region and includes the installation of the following TSM&O Equipment – 96 count FOC, 24 count FOC for drop cables, Closed Circuit Television (CCTV) cameras at most signalized intersections that are without, and BlueTooth detectors (approximately every 2 miles).
Project Status: Planned
Project Stakeholders:
Interconnect and Flow

Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
Lake County TMC - TMC Basic Surveillance
-
01: The center shall monitor, analyze, and store traffic sensor data (speed, volume, occupancy) collected from field elements under remote control of the center.
-
02: The center shall monitor, analyze, and distribute traffic images from CCTV systems under remote control of the center.
-
Lake County TMC - TMC Signal Control
-
01: The center shall remotely control traffic signal controllers.
-
03: The center shall collect traffic signal controller operational status and compare against the control information sent by the center.
-
04: The center shall collect traffic signal controller fault data from the field.
-
05: The center shall manage (define, store and modify) control plans to coordinate signalized intersections, to be engaged at the direction of center personnel or according to a daily schedule.
-
06: The center shall implement control plans to coordinate signalized intersections based on data from sensors.
-
07: The center shall manage boundaries of the control sections used within the signal system.
-
08: The center shall maintain traffic signal coordination including synchronizing clocks throughout the system.
-
Lake County TMC - TMC Traffic Information Dissemination
-
01: The center shall remotely control dynamic messages signs for dissemination of traffic and other information to drivers.
-
03: The center shall collect operational status for the driver information systems equipment (DMS, HAR, etc.).
Standards:
Project Operational Concepts:
Last Updated 3/23/2022