Florida Department of Transportation
Florida Statewide and Regional ITS Architectures

Florida ITS Architecture Banner
 

R2CTPO TSMO Phase 2 - West Volusia

Project Description: Phase 2 of the upgrade of the R2CTPO ATMS, or Deployment 2, is located in the DeLand region and includes the installation of the following TSM&O Equipment – 96 count FOC, 24 count FOC for drop cables, CCTVs at most signalized intersections that are without, BlueTooth detectors (approximately every 2 miles).

Project Status: Planned

Project Stakeholders:
Project Inventory:

Project Service Packages: Project Information Flows:

Information Flow Source Element Destination Element Status
roadway dynamic signage data Volusia County TMC Volusia County Field Equipment Planned
roadway dynamic signage status Volusia County Field Equipment Volusia County TMC Planned
signal control commands Volusia County TMC Volusia County Field Equipment Planned
signal control device configuration Volusia County TMC Volusia County Field Equipment Planned
signal control plans Volusia County TMC Volusia County Field Equipment Planned
signal control status Volusia County Field Equipment Volusia County TMC Planned
signal fault data Volusia County Field Equipment Volusia County TMC Planned
signal system configuration Volusia County TMC Volusia County Field Equipment Planned
traffic detector control Volusia County TMC Volusia County Field Equipment Planned
traffic detector data Volusia County Field Equipment Volusia County TMC Planned
traffic images Volusia County Field Equipment Volusia County TMC Planned
video surveillance control Volusia County TMC Volusia County Field Equipment Planned


Project Functional Requirements (Element - Functional Object):

Standards:

Project Operational Concepts:

Last Updated 4/19/2024