City of Melbourne CCTV/VDS
Project Description: Multiple Projects: SR 508/NASA Blvd from SR5/US 1 to Wickham Rd – ITS Expansion including fiber, CCTV, Bluetooth and SR5/US 1 from Lake Washington Rd to Post Rd – ITS Expansion including fiber, CCTV, Bluetooth
Project Status: On-going
Project Stakeholders:
Interconnect and Flow

Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
City of Melbourne Field Equipment - Roadway Basic Surveillance
-
01: The field element shall collect, process, digitize, and send traffic sensor data (speed, volume, and occupancy) to the center for further analysis and storage, under center control.
-
02: The field element shall collect, process, and send traffic images to the center for further analysis and distribution.
-
04: The field element shall return sensor and CCTV system operational status to the controlling center.
-
05: The field element shall return sensor and CCTV system fault data to the controlling center for repair.
-
City of Melbourne Field Equipment - Roadway Passive Monitoring
-
01: The field element shall collect, process, and send data to the center to uniquely identify passing vehicles in order to support travel time measurement
-
City of Melbourne Traffic Operations Center - TMC Basic Surveillance
-
01: The center shall monitor, analyze, and store traffic sensor data (speed, volume, occupancy) collected from field elements under remote control of the center.
-
02: The center shall monitor, analyze, and distribute traffic images from CCTV systems under remote control of the center.
-
City of Melbourne Traffic Operations Center - TMC Passive Surveillance
-
01: The center shall collect time stamped vehicle identities from field equipment.
-
02: The center shall correlate the time stamped vehicle identities in order to calculate link travel times and derive other traffic measures.
Standards:
Project Operational Concepts:
Last Updated 3/23/2022