Lakeland Intersection Collision Avoidance Safety Program (iCASP)
Project Description: This project is a Red light running safety project which will be implemented at FDOT intersections in Lakeland. iCASP predicts a vehicle running a red light and then extends the all–red phase (delays the green phase) and helps prevent red light running crashes. There are currently 4 test sites are in operation: Massachusetts Avenue and Memorial Boulevard; S. Florida Avenue and Beacon Road; Bartow Road US 98 and N. Crystal Lake Drive; and Memorial Boulevard and Dr. M. L. King Street. iCASP will be implemented at additional intersections with high instances of red–light running.
Project Status: Planned
Project Stakeholders:
Interconnect and Flow
Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
City of Lakeland Advanced Traffic Management System - TMC Basic Surveillance
-
1: The center shall monitor, analyze, and store traffic sensor data (speed, volume, occupancy) collected from field elements under remote control of the center.
-
City of Lakeland Advanced Traffic Management System - TMC Intersection Safety
-
1: The center shall provide current intersection safety status information.
-
City of Lakeland Advanced Traffic Management System - TMC Signal Control
-
1: The center shall remotely control traffic signal controllers.
-
9: The center shall implement control plans to coordinate signalized intersections based on data from sensors and connected vehicles.
-
City of Lakeland Field Equipment - Roadway Signal Control
-
1: The field element shall control traffic signals under center control.
-
4: The field element shall report the current signal control information to the center.
-
6: The field element shall return traffic signal controller operational status to the center.
Standards:
Project Operational Concepts:
Roles and Responsibilities
Last Updated 4/18/2024