FDOT District 1 I-75 Fog Detection System in Sarasota County
Project Description: Install Visibility Sensors, thermal CCTV's and Flashing Beacons every mile from the Charlotte County Line to Manatee County Line.
Project Status: Planned
Project Stakeholders:
Interconnect and Flow
Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
FDOT District 1 Field Equipment - Roadway Basic Surveillance
-
2: The field element shall collect, process, and send traffic images to the center for further analysis and distribution.
-
FDOT District 1 Field Equipment - Roadway Environmental Monitoring
-
2: The field element shall include environmental sensors that measure weather conditions including temperature, wind, humidity, precipitation, and visibility.
-
4: The field element's environmental sensors shall be remotely controlled by a traffic management center.
-
FDOT District 1 Field Equipment - Roadway Traffic Information Dissemination
-
1: The field element shall include dynamic message signs for dissemination of traffic and other information to drivers, under center control; the DMS may be either those that display variable text messages, or those that have fixed format display(s) (e.g. vehicle restrictions, or lane open/close).
-
FDOT SWIFT Center - MCM Environmental Information Collection
-
1: The center shall remotely control environmental sensors that measure road surface temperature, moisture, icing, salinity, and other measures.
-
FDOT SWIFT Center - TMC Basic Surveillance
-
2: The center shall monitor, analyze, and distribute traffic images from CCTV systems under remote control of the center.
-
FDOT SWIFT Center - TMC Environmental Monitoring
-
1: The traffic center shall remotely control environmental sensors that measure road surface conditions including temperature, moisture, icing, salinity, and other measures.
-
2: The traffic center shall remotely control environmental sensors that measure weather conditions including temperature, wind, humidity, precipitation, and visibility.
-
FDOT SWIFT Center - TMC Traffic Information Dissemination
-
1: The center shall remotely control dynamic messages signs for dissemination of traffic and other information to drivers.
Standards:
Project Operational Concepts:
Roles and Responsibilities
- FDOT District 1
- Collect environmental information from its own field equipment, and from public and private weather service providers.
- Monitor traffic images and traffic flow data through CCTVs and field sensors, and maintain operational control of its own field equipment.
- Provide traffic information to travelers via private companies, the southwest Florida traveler information system, and county and city DMS equipment.
Last Updated 4/18/2024