FDOT I-75 Arterial DMS
Project Description: This project will install DMS on arterials leading to I–75 in FDOT District 1. This is a multi–phased project in which DMS will be installed in Charlotte, Manatee, Sarasota, Lee and Collier counties in different phases.
Project Status: Planned
Project Stakeholders:
Interconnect and Flow
Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
FDOT District 1 Field Equipment - Roadway Traffic Information Dissemination
-
1: The field element shall include dynamic message signs for dissemination of traffic and other information to drivers, under center control; the DMS may be either those that display variable text messages, or those that have fixed format display(s) (e.g. vehicle restrictions, or lane open/close).
-
FDOT SWIFT Center - TMC Traffic Information Dissemination
-
1: The center shall remotely control dynamic messages signs for dissemination of traffic and other information to drivers.
-
12: The center shall receive alert notification of a major emergency such as a natural or man-made disaster, civil emergency, or child abduction for distribution to the public from emergency management.
-
13: The center shall receive low emission zone information from emission management.
-
3: The center shall collect operational status for the driver information systems equipment (DMS, HAR, etc.).
Standards:
Project Operational Concepts:
Roles and Responsibilities
Last Updated 4/18/2024