FDOT I-75 Ramp Signals
Project Description: This project would install ramp signals on I–75.
Project Status: Planned
Project Stakeholders:
Interconnect and Flow
Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
FDOT District 1 Field Equipment - Roadway Basic Surveillance
-
1: The field element shall collect, process, digitize, and send traffic sensor data (speed, volume, and occupancy) to the center for further analysis and storage, under center control.
-
2: The field element shall collect, process, and send traffic images to the center for further analysis and distribution.
-
FDOT District 1 Field Equipment - Roadway Traffic Information Dissemination
-
1: The field element shall include dynamic message signs for dissemination of traffic and other information to drivers, under center control; the DMS may be either those that display variable text messages, or those that have fixed format display(s) (e.g. vehicle restrictions, or lane open/close).
-
4: The field element shall provide fault data for the driver information systems equipment (DMS, HAR, etc.) to the center for repair.
-
7: The field element shall include devices that receive configuration data from other field element devices, without center control.
-
FDOT District 1 Field Equipment - Roadway Traffic Metering
-
1: The field element shall regulate the flow of traffic on ramps, interchanges, and the mainline, under center control.
-
2: The field element shall monitor operation of ramp, interchange, and mainline meters and report to the center any conflicts between received control plans and current system operation.
-
3: The field element shall return ramp, interchange, and mainline meter operational status to the controlling center.
-
FDOT I-75 Satellite Center - TMC Basic Surveillance
-
1: The center shall monitor, analyze, and store traffic sensor data (speed, volume, occupancy) collected from field elements under remote control of the center.
-
FDOT I-75 Satellite Center - TMC Roadway Equipment Monitoring
-
1: The center shall collect and store sensor (traffic, pedestrian, multimodal crossing) operational status.
-
FDOT I-75 Satellite Center - TMC Traffic Information Dissemination
-
1: The center shall remotely control dynamic messages signs for dissemination of traffic and other information to drivers.
-
15: The center shall coordinate information dissemination with other traffic management centers.
-
3: The center shall collect operational status for the driver information systems equipment (DMS, HAR, etc.).
-
4: The center shall collect fault data for the driver information systems equipment (DMS, HAR, etc.) for repair.
-
FDOT I-75 Satellite Center - TMC Traffic Metering
-
1: The center shall remotely control systems to manage use of the freeways, including ramp, interchange, and mainline metering.
-
2: The center shall collect operational status from ramp meters, interchange meters, and mainline meters and compare against the control information sent by the center.
-
3: The center shall collect fault data from ramp meters, interchange meters, and mainline meters.
-
FDOT SWIFT Center - TMC Basic Surveillance
-
1: The center shall monitor, analyze, and store traffic sensor data (speed, volume, occupancy) collected from field elements under remote control of the center.
-
FDOT SWIFT Center - TMC Roadway Equipment Monitoring
-
1: The center shall collect and store sensor (traffic, pedestrian, multimodal crossing) operational status.
-
FDOT SWIFT Center - TMC Traffic Information Dissemination
-
1: The center shall remotely control dynamic messages signs for dissemination of traffic and other information to drivers.
-
15: The center shall coordinate information dissemination with other traffic management centers.
-
18: The center shall distribute wrong way entry data to emergency management centers and traveler information providers.
-
4: The center shall collect fault data for the driver information systems equipment (DMS, HAR, etc.) for repair.
-
FDOT SWIFT Center - TMC Traffic Metering
-
1: The center shall remotely control systems to manage use of the freeways, including ramp, interchange, and mainline metering.
-
2: The center shall collect operational status from ramp meters, interchange meters, and mainline meters and compare against the control information sent by the center.
-
3: The center shall collect fault data from ramp meters, interchange meters, and mainline meters.
Standards:
Project Operational Concepts:
Roles and Responsibilities
- FDOT District 1
- Monitor traffic images and traffic flow data through CCTVs and field sensors, and maintain operational control of its own field equipment.
- Operate and coordinate traffic control devices, traffic sensors, and CCTVs on FDOT freeways, including the ability to control traffic on overflow ramps.
- Owns, operations and maintains DMS.
Last Updated 4/18/2024