City of Lakeland Bus Rapid Transit
Project Description: This project would deploy Bus Rapid Transit in the City of Lakeland, including TSP.
Project Status: Planned
Project Stakeholders:
Interconnect and Flow
Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
City of Lakeland Advanced Traffic Management System - TMC Signal Control
-
1: The center shall remotely control traffic signal controllers.
-
City of Lakeland Field Equipment - Roadway Signal Control
-
1: The field element shall control traffic signals under center control.
-
10: The field element shall receive request for transit vehicle signal priority.
-
6: The field element shall return traffic signal controller operational status to the center.
-
8: The field element shall report current transit priority status to the center.
-
Lakeland Citrus Connection Transit Vehicles - Transit Vehicle Signal Priority
-
2: The transit vehicle shall send priority requests to traffic signal controllers at intersections, pedestrian crossings, and multimodal crossings on the roads (surface streets) and freeway (ramp controls) network that enable a transit vehicle schedule deviation to be corrected.
-
4: The transit vehicle shall prevent a priority request from being sent when the transit vehicle cannot use the priority (e.g., when the transit vehicle makes a passenger stop on the approach to an intersection).
Standards:
Project Operational Concepts:
Roles and Responsibilities