LeeTran Transit Signal Priority
Project Description: This project would create transit signal priority for LeeTran
Project Status: Planned
Project Stakeholders:
Interconnect and Flow
Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
Lee County and Cities Field Equipment - Roadway Signal Control
-
1: The field element shall control traffic signals under center control.
-
10: The field element shall receive request for transit vehicle signal priority.
-
Lee County-Wide Advanced Traffic Management System - TMC Signal Control
-
10: The center shall adjust signal timing in respond to a signal prioritization, signal preemption, pedestrian call, multi-modal crossing activation, or other requests for right-of-way.
-
LeeTran Fixed Route Transit Vehicles - Transit Vehicle Signal Priority
-
2: The transit vehicle shall send priority requests to traffic signal controllers at intersections, pedestrian crossings, and multimodal crossings on the roads (surface streets) and freeway (ramp controls) network that enable a transit vehicle schedule deviation to be corrected.
-
3: The transit vehicle shall send the schedule deviation data and status of priority requests to the transit vehicle operator and provide the capability for the transit vehicle operator to control the priority system.
-
4: The transit vehicle shall prevent a priority request from being sent when the transit vehicle cannot use the priority (e.g., when the transit vehicle makes a passenger stop on the approach to an intersection).
-
LeeTran Transit Operations Center - Transit Center Priority Management
-
1: The center shall analyze transit vehicle schedule performance to determine the need for priority along certain routes or at certain intersections.
-
2: The center shall send requests for priority along routes or at intersections to traffic management.
Standards:
Project Operational Concepts:
Roles and Responsibilities
- Lee County DOT
- Operate traffic signal systems for Lee County.
- Provide signal priority for transit.
- LeeTran
- Obtain traffic signal priority from the Lee County ATMS using Lee County roadside field equipment for LeeWay fixed-route transit vehicles.
Last Updated 4/18/2024